Project Conclusion

The Blue Button Extension - Medical Imaging project team regrets to inform you that our one month project extension will not proceed as anticipated. We would like to thank you, again, for all of the time and guidance you've dedicated to making the prototype so successful.
Regards,
The Blue Button Extension - Medical Imaging Project Team

0 comments

Sprint 20 Review and Completed Prototype Demonstration for All Stakeholders

We just completed Sprint 20, which aligned with our completed prototype demonstration to the comprehensive stakeholder group. Our team wrapped-up all items on the Product Backlog during the project PoP and accomplished the following specific tasks over the past 2 weeks:

  • Documentation
    • Continued Technical Manual development and Install Manual updates
    • Drafted release notes
  • Development
    • Complete VA Sandbox configurations
    • Supported System Test
  • Test
    • Conducted final system test; documented findings

Yesterday on Wednesday, 2/20 our team presented an additional demonstration to an executive group of stakeholders from the VACI, VA OIT Management, MHV, etc. and received great praise not only on the capabilities we developed, but for how our team was instrumental in involving such a wide range of stakeholders who contributed to the success of the prototype.

With this in mind, PwC and Harris are pleased to announce that we have exercised a no-cost, 1 month extension with the VA to continue development and keep the team in tact while we explore with the VA additional follow-on work geared towards Production implementation. During this time we will continue our Sprint Review meetings; the next meeting is scheduled for Thursday, 3/7 at 10am EST. [Note: approved deliverables will be updated to the VA SharePoint repository at the beginning of March.]

You all have been extremely influential in the prototype development, and our team is grateful for all of the time and guidance provided to our team. We know you juggle your regular day jobs on top of participating in our bi-weekly meetings, and appreciate all of the effort lent for this project.

We are very pleased to say that this solution is as much yours as it is our team's, the VACI's, the VA OIT's, the non-VA providers', and most importantly - the Veterans'.

Our team wouldn't be where we are today without the help and guidance of everyone involved, and we would like to extend our sincere thanks to all of you, and we look forward to working with you during our extension and in the future!

Sincerely,

The Blue Button Extension: Medical Imaging Team

Attached is the presentation provided during the session.
Download file "BBMI Sprint 20 Review Session_Final Stakeholder Demo_2013February21.pdf"

0 comments

Sprint 19 Review, Sprint 20 Planning

The contract is winding down to its final few weeks (officially ends 3/4) and we're approaching the end of our development, test, and resolve bug phase.

The team just completed Sprint 19 and accomplished the following tasks:

  • Documentation
    • SDD - updated user interface section
    • Install Manual - draft expanded
    • Technical Manual - some sections drafted
      • Introductory sections
      • Configuration files
      • Troubleshooting
  • Development
    • Setup VistA Server within VA Sandbox
    • Supported System Test
    • Updated security certificates (DSM)
    • Minor updates to acknowledgement text
  • Test
    • Conducted system test; documented findings

After planning for Sprint 20 this afternoon (the last Sprint!), the follow is a list of our final objectives:

  • Documentation
    • Continue Technical Manual development
    • Draft Release Notes
  • Development
    • Complete Sandbox configurations
    • Support System Test
  • Test
    • Perform final system test
    • Populate Stage 2 Final Test Report for 2/25 delivery

Please note some import dates:

  • All final project documents, test reports, and code are due to the VA 2/25; updates will be made to the VA SharePoint page once these documents are approved by Kevin DeOrsey (VA PM and Innovation Coordinator)
  • 2/20 will be our final executive demonstration and 2/21 will be the final demonstration to all stakeholders during our regularly scheduled Sprint 20 Review

Attached is the presentation provided during the session.
Download file "BBMI Sprint 19 Review Session_2013February07.pdf"

Note: Currently there are no formal plans for the prototype after our contract has finished. At this time the prototype is not scheduled to be moved into Production.

0 comments

Sprint 18 Review, Sprint 19 Planning

Our team has just completed Sprint 18 and accomplished the following tasks:

  • Documentation
    • Developed unit tests
    • Complete Installation Guide draft
  • Development
    • Page/Report updates to align with My HealtheVet December release
    • Minor bug fixes
    • Memory analysis
    • Complete unit tests
  • Test
    • Complete Test Plan development
    • Conduct informal system test

After planning for Sprint 19, the follow is a list of objectives:

  • Documentation
    • Complete Installation Guide
    • DraftTechnical Manual Draft
  • Development
    • Setup VistA server wihtin VA Sandbox
    • Support System Test
    • Update security certificates (DSM)
  • Test
    • Conduct System Test; document findings

Please note some import dates:

  • 1/24 was our code freeze for our developers; we may modify code to resolve defects/bugs identified during system testing in Sprint 19 and 20
  • All final project documents, test reports, and code are due to the VA 2/25; updates will be made to the VA SharePoint page once these documents are approved by Kevin DeOrsey
  • 2/20 will be our final executive demonstration, and 2/21 will be our final demonstration to all stakeholders during our regularly scheduled Sprint 20 Review

Attached is the presentation provided during the session.
Download file "BBMI Sprint 18 Review Session_2013January24.pdf"

0 comments

Sprint 17 Review, Sprint 18 Planning

Our team has just completed Sprint 17 and accomplished the following tasks:

  • Documentation
    • Developed and enhanced System Test documentation (includes manual tests)
    • Installation Plan – outlined, working initial draft
    • Technical Guide – outlined
  • Development
    • LiftLite integration completed
      • FileZilla Server integrated as cache
    • Core updates: Imagery/Proxy authentication , Centralized session mgmt, Clean-up service
    • Status page improved; Download page improved
    • Status Log Page improved; added state explanations to top of page
    • Reviewed pages and report language with Kathleen Painter’s team
      • Minor updates incorporated
    • VA Sandbox Setup
      • VistA Server – progressing – VM received and in process of being loaded
    • Software system test completed
    • Investigated:
      • Sandbox performance; esp. interaction with MDWS; still ongoing
      • Use of VIX Checksum
      • Incorporation of image # (PDF report, Preview Page)
      • Use of .bluebutton format
    • Other: Provided orientation/overview to interested stakeholders (1/7)
  • Test
    • Automated test code extended; manual tests performed

After planning for Sprint 18, the follow is a list of objectives:

  • Documentation
    • Update unit tests and software system test
    • Complete Installation Guide Draft
    • Complete Technical Manual Draft
  • Development
    • Page/Report updates to align with MHV December release
    • Memory analysis
    • Complete MDWS performance analysis
    • Complete unit tests
    • Repeat software system test
  • Test
    • Complete Test Plan development
    • Conduct informal system test

Attached is the presentation provided during the session.
Download file "BBMI Sprint 17 Review Session_2013January10.pdf"

0 comments

Updates to Approved Requirements - January 2013

Recently our Product Owner, Kevin DeOrsey, has approved updates to our requirements for Stages 1 and 2; please see the updated list of requirements attached. Appropriate tandem updates to our technical deliverables (SDD, PSD, MTP) are in the works and we anticipate posting these updated documents to our VA SharePoint page once they are formally accepted by Kevin.


Major updates were to requirements 1.16 (Bluebutton format of Radiology Report), 1.20 (burning patient identifiers into the referential image), and 1.21 (burning identifying information about the image into the referential image).


Download file "BBMI_Stage 1 and 2 Requirements_User Stories_updated 2013January07.pdf"

0 comments

Sprint 16 Review, Sprint 17 Planning

Our team has just completed Sprint 16 and accomplished the following tasks:
  • Documentation
    • Developed and enhanced test plans/cases
    • Updated SDD (sequence diagrams - LiFT related)
  • Development
    • Modified Direct email message per feedback from last Sprint
    • LiftLite integration (NOTE: name change)
      • Encryption added to temporary files
      • Checksum calculations (progressing)
      • Storage cache cleanup - remove expired files
      • Added retry capability for sending reports (configurable - currently set to 3)
    • Performance improvements
      • Added asynchronous processing for sending file to external provider
      • Reduced number of calls to MDWS
    • Database: completed conversion to use Hibernate
    • VA Sandbox setup
      • Direct Server - complete
      • VistA Server - progressing; VM received and in proces sof being loaded
    • Other: VLER Direct Discussions, Site content review (K. Painter)
  • Test
    • Automated test code extended

After planning for Sprint 17, the follow is a list of objectives:

  • Documentation
    • Update unit test and software system test
    • Begin Installation Guide
    • Begin Technical Manual
  • Development
    • Complete MDWS performance analysis
    • Complete LiftLite integration
    • Compelte VistA Server setup on VA Sandbox
    • Complete software system testing
  • Testing
    • Continue Test Plan development
    • Conduct informal system test

Attached is the presentation provided during the session.
Download file "BBMI Sprint 16 Review Session_2012December13.pdf"

Please note that Sprint 17 will be extended to 3 working weeks and our next Sprint Review will be Thursday, January 10th. In the meantime, our team would like to extend to all of you wishes for happy holidays and a great New year!

0 comments

Sprint 15 Review, Sprint 16 Planning

As we recently completed Sprint 14, the team's accomplishments are as follows:

  • Documentation
    • Updated the System Design Document (SDD) -- UI descriptions, sequence diagrams
    • Developed and enhanced test plans/cases
  • Development
    • Investigatied LiFT integration options
    • Created framework for LiFT integration
      • Added classes to manage cache and downloads
    • Refreshed VA Sandbox prototype with latest version
    • Code cleanup
  • Test
    • Automated test code extended

After planning for Sprint 16, the follow is a list of objectives:

  • Documentation
    • SDD updates as needed -- LiFT framework
  • Development
    • Continue LiFT integration
      • Integrate LiFT classes into framework
      • Add encryption to temporarily stored files
    • Add asynchronous processing to sending file to external provider
    • Begin setup of VistA Server on VA Sandbox Server
    • Setup Direct on VA Sandbox Server
  • Testing
    • Continue Test Plan development

Attached is the presentation provided during the session.
Download file "BBMI Sprint 15 Review Session_2012November29.pdf"

And for those of you who are recently joining our calls for Stage 2 (and may not have background for Stage 1 or what Stage 2 work has been done thus far), and just a a gentle reminder to attendees that haven't joined in a while: if you think you need an orientation/overview on the project, or would like to be caught up to speed, please reach out to us via email and we'd love to set up a meeting with you.

For our immediate new joiners who haven't received any background and are attending Sprint Reviews for the first time, we ask that you please hold your questions til the end of the call, or reach out to us directly outside of Sprint Review (Kim Cirka, Kathleen Keating, or Kevin DeOrsey - emails on the first page of this wiki). We always welcome your participation, but would like to save orientation/overview items for another time - Sprint Reviews are meant to be focused on work done during the Sprint and suggestions you, the stakeholders, may have for work to be done until the contract is finished.

0 comments

Sprint 14 Review, Sprint 15 Planning

As we recently completed Sprint 14, the team's accomplishments are as follows:

  • Documentation
    • Updated the System Design Document (SDD)
    • Developed and enhanced test plans/cases
  • Development
    • Configured VA Sandbox MDWS to access HCL VistA
    • LiFT installation completed; documented
      • Begin LiFT integration
    • Direct Email – PDF added; integrated with DB; email securely transmitted
    • VistA Imaging Test Data
      • Improved algorithm for 12-bit to 8-bit conversion
      • Resolved memory issues – adjusted Tomcat configuration
    • Revisiting additional fields for Radiology Repo (not included in response from getRadiologyReports)
  • Test
    • Automated test code extended

After planning for Sprint 15, the follow is a list of objectives:

  • Documentation
    • SDD updates as needed; sequence diagrams
  • Development
    • Continue LiFT effort
      • Update Direct email message with DICOM file size and URL for downloading file
    • Begin creating VA Sandbox server to host our VistA version
    • Continue investigation of including new fields in Radiology Report
    • Refresh prototype version in VA Sandbox
  • Testing
    • Continue Test Plan development

Attached is the presentation provided during the session.


Download file "BBMI Sprint 14 Review Session_2012November15.pdf"

0 comments

Sprint 13 Review, Sprint 14 Planning

As we recently completed Sprint 13, the team's accomplishments are as follows:

  • Documentation
    • Minor updates to the System Design Document (SDD)
    • Developed and enhanced test plans/cases
  • Development
    • VIX: configured for DICOM support
    • Updated to VIX’s Integration Discovery Service (IDS)
    • Initial DICOM file accessed via web service
    • Sent Report log page: resend functionality added
    • Initial email messages generated (unsecure, Direct)
    • Logo created for Direct webmail tool
    • Initial LiFT installation
    • Code cleanup
  • Test
    • Automated test code extended

After planning for Sprint 14, the follow is a list of objectives:

  • Documentation
    • SDD: update with design modifications
  • Development
    • Complete LiFT installation
    • Use LiFT to store image (BBMI-LiFT integration); generate URL
    • Direct email: add PDF attachment, include LiFT URL, use addresses from database
    • Install in VA Sandbox and configure with VAi2 version of MDWS
  • Testing
    • Continue to update test plans, test cases
    • Enhance automated test code

Attached is the presentation provided during the session.

Download file "BBMI Sprint 13 Review Session_2012November01.pdf"

0 comments

Sprint 12 Review, Sprint 13 Planning

Two weeks prior during Sprint 12, the System Design Document (SDD) was approved and we are currently actively making updates to it in parallel with current MHV Production changes. While this is a prototype effort, we like to remain Agile and on-our-toes for changes occurring in current Production systems the we interface with to be better prepared if/when the BBMI solution is put into Production.

As we recently completed Sprint 12, the team's accomplishments are as follows:

  • Documentation
    • Internal process document: updating VistA credentials
  • Development
    • 12-bit images converted to 8-bit (initial algorithm)
    • New pages implemented for Sending Report to an external provider
    • Development server set up with Direct Secure Messaging (and related software)
    • New MDWS version evaluated; minimal impact

After planning for Sprint 13, the follow is a list of objectives:

  • Documentation
    • SDD: update with wireframe modifications
  • Development
    • Update HCL MDWS version
    • Improve 12-bit conversion algorithm
    • Install Patch 99 to VistA Imaging
    • Add ‘Resend’ functionality to Sent Report Log
    • UI/Wireframe updates as needed
    • Generate Direct message from code
    • Initial DICOM file access via web service
  • Testing
    • Update test plans, test cases
    • Enhance automated test code

Attached is the presentation provided during the session.

Download file "BBMI_Sprint 12 Review Session_2012Oct18.pdf"

0 comments

Sprint 11 Review, Sprint 12 Planning

The Presidential demos we delivered on 9/26 and 10/1 were well-received by the audience. It's truly exciting to see how our prototype is influencing other initiatives and solutions, and our teams are able to work collaboratively to achieve larger, more integrated solutions -- as well as receiving so much support that the BBMI prototype is wanted in Production...well, yesterday!

Over the past two weeks, the Master Test Plan (MTP) and Stage 2 User Stories were approved, so we've finished populating the product backlog with these items. The team is still awaiting final approval of the SDD. Once all outstanding documents are approved, they will be posted to our VA SharePoint page.

In the meantime, we anticipate Sprint 12 to be a time to align with new MHV updates and the beginning of some major Direct updates.

As we recently completed Sprint 11, the team's accomplishments are as follows:

  • Documentation
    • SDD and MTP: peer reviewed, updated, and submitted for approval
  • Development
    • Initial database implementation; updated login authentication
    • UI framework updates: Banner, Navigation, Home
    • Design updates
    • Wireframe updates
    • Initial Direct install
After planning for Sprint 12, the follow is a list of objectives:
  • Documentation
    • SDD: update as necessary per feedback for approval
  • Development
    • Update HCL MDWS
    • Complete Direct setup/configuration
    • Integrate 12-bit to 8-bit conversion
    • Comparison of approaches for retrieving DICOM files
Attached is the PPT provided during the session.
Download file "BBMI_Sprint 11 Review Session_2012Oct04.pdf"

0 comments

Sprint 10 Review, Sprint 11 Planning

Our team has successfully launched into the Stage 2 requirements/development process. The Prototype Specification Document (PSD) with additions of Stage 2 requirements has been submitted for approval, and we are waiting on final approval of the Stage 2 User Stories to populate our product backlog. Additionally, the System Design Document (SDD) and Master Test Plan (MTP) are being modified for Stage 2 additions and are to be submitted at the end of this month.

In the meantime while we wait for the User Stories' approval, we anticipate Sprint 11 to be a continuation of wireframe updates, documenting of stakeholder feedback/suggestions, and development task refinement to best align stakeholder and system functionality goals with our design and development plans.

As we recently completed Sprint 10, the team's accomplishments are as follows:

  • Documentation
    • PSD, SDD, MTP
  • Development
    • Radiology Report updates: Text, PDF
    • 12-bit/8-bit conversion issue: VIX software updated (still need to test)
    • Design updates
    • Wireframe updates
    • dcm4che installed
After planning for Sprint 11, the follow is a list of objectives:
  • Documentation
    • SDD/MTP: peer review, update, submission for approval
  • Development
    • MDWS updates
    • Initial Direct installation
    • Initial database implementation; update login authentication
    • Wireframe updates
    • UI framework updates: Banner, Navigation, Home
Attached is the PPT provided during the session.
Download file "BBMI_Sprint 10 Review Session_2012Sept20.pdf"
Our team is also excited to report two things: first, we have created a new Blue Button Extension - Medical Imaging VA SharePoint page to share all of our approved deliverables and various project documents with the stakeholder community; second, we will also be supporting a Stage 1 demonstration and Stage 2 discussion with Dr. Levin and some Presidential Fellows next week!
On behalf of the BBMI team, we look forward to sharing our Sprint 11 progress with you in two weeks on 10/4.

0 comments

Completed Stage 1 Demonstration (Sprint 9 Review), Sprint 10 Planning

Many thanks to all of our stakeholders and VA management for helping guide our team to this point. We sincerely appreciate all of your patience, guidance, and feedback that went into making this prototype product what it is today, and anticipate your continued participation as we move into Stage 2.

Our completed Stage 1 demonstration was initially delivered to an executive audience, including VAi2, RGI, and Harris representatives, on September 5th and received outstanding reviews; the second demonstration to all of our stakeholders was given on the 6th and smoothly transitioned our team into Stage 2.

The following list marks our team's Sprint 9 major accomplishments for concluding Stage 1 development, test, and documentation efforts:

  • Technical documentation updates
  • Final test procedure execution, documentation updates, and test report delivery
  • Minor code updates to mimic My HealtheVet page content (i.e. footer information)
  • Preparation for demonstrations
  • Initial investigation into 12bit to 8bit conversion
  • VA Innovations Sandbox installation and test
  • Stage 2 PSD population, review, and submission
After planning for Sprint 10, the follow is a list of objectives to jump start us into Stage 2 development:
  • Complete VA Innovations Sandbox installation
  • Finish developing wireframes for steps an external provider would expect
  • Update System Design Document (SDD) and Master Test Plan (MTP) to include Stage 2 specs
  • Continue 12bit to 8bit conversion research
  • Design a fall-back algorithm if an accession number isn't present (matching metadata to MDWS Radiology Reports)
Attached is the PPT provided during the session. It does not include screenshots of the demonstration, so if you haven't seen it in its entirety, please feel free to reach out to a team member for more information.
Download file "BBMI_Sprint 9 Review Session_Stage1 Final Demo_2012Sept06.pdf"

0 comments

Sprint 8 Review, Sprint 9 Planning

I'm excited to report that we had our Stage 1 code freeze on 8/17 in preparation for final testing. Testing will be continued throughout the remainder of August as our Final Test Report is due to VA on 8/29.

Our team is also anticipating a formal executive Stage 1 demonstration (which includes RGI, Harris, VAi2, and other VA management staff) on 9/5 and a full demonstration to all stakeholders 9/6 during our usual review meeting.

As we are wrapping up Stage 1 development and documentation updates, the following is a list of our team's Sprint 8 accomplishments for Stages 1 and 2:

  • Stage 1
    • Documentation
      • Completed Code and Unit Test (CUT) Plans
      • Completed Integration Test Plan
      • Documented Build Process
    • Development
      • Used middle image as default referential image (when PDF report file size > 3MB)
      • Investigated use of GDAL library to resolve referential image non-displayable issues
      • Minor updates to Results page
      • Support System Test
    • Test
      • Functional Test Plan (draft) completed
      • Developed automated and manual tests
      • Conducted System test
  • Stage 2
    • Documentation
      • Prototype Specification Document (PSD) draft completed
      • Requirements reviewed with VLER
        • VLER approved
    • Development
      • Wirerfame updates (minor) - removed disclaimer
After planning for Sprint 9, the follow is a list of objectives:
  • Stage 1
    • Documentation
      • Complete Functional Test Plan/Test Suites
      • System Test Results (Final Test Report)
    • Development
      • Support system test
      • Prepare for final demonstration
    • Test
      • Complete system testing
  • Stage 2
    • Documentation
      • Publish Prototype Specification Document (PSD)
      • Begin System Design Document (SDD)
    • Development
      • Resolve non-displayable image issue
      • Begin analysis of changes in output templates and web pages
      • Wireframe updates
Attached is the PPT provided during the session.
Download file "BBMI Sprint 8 Review Session_2012August23.pdf"
We anticipate all stakeholders to participate in the 9/6 demonstration and are looking forward to further work on Stage 2.

0 comments

Sprint 7 Review, Sprint 8 Planning

The following is a list of our team's Sprint 7 accomplishments:

  • Stage 1
    • Documentation
      • System Design Document (SDD) updates - detailed design
      • Code and Unit Test (CUT) Plans
    • Development
      • Preview Page - added text of Radiology Report
      • Code cleanup
      • CUT conducted
        • User Interface, Search
        • Report generation
      • Test
        • Test development and updates (test suites - automated)
  • Stage 2
    • Documentation
      • Prototype Specification Document (PSD; draft)
After planning for Sprint 8, the follow is a list of objectives:
  • Stage 1
    • Documentation
      • Complete System Test Plan
    • Development
      • Key Image Identification
      • Resolve referential image non-displayable issue
      • Complete CUT
      • Document build process
        • Install on VA Sandbox
      • Support system test
        • Resolve identified issues
    • Test
      • Conduct system test
  • Stage 2
    • Documentation
      • Prototype Specification Document (PSD) updates
    • Development
      • Wireframe updates
      • Initial design related to interfaces (LiFT, Direct)
Attached is the PPT provided during the session.
Download file "BBMI Sprint 7 Review Session_2012August09.pdf"

0 comments

Sprint 6 Review, Stage 2 Kickoff, and Sprint 7 Planning

I'm excited to report that our team has made tremendous progress on all of our Stage 1 work, and is coming to the end of this increment at the end of August. We anticipate having the last few bits of Stage 1 requirements met by the end of Sprint 7, and testing/bug fixes starting in August.

Aside from our Sprint 6 development, documentation, and test objectives, the team had gotten a head start on Stage 2 preparation and was prepared to begin those discussions after the Sprint 6 review. The Stage 2 kickoff marked a new time for requirements elicitation, new stakeholder involvement, and new feedback on our progress, our methodology, and our Stage 2 objectives.

The following is a list of our team's Sprint 6 accomplishments:

  • Documentation
    • Stage 1 System Design Document (SDD) updates
  • Development
    • Added basic login/logout
    • Preview Page -- added pagination, added capability to show enlarged images (zoom)
    • Results Summary Grid -- display PDF file size in KB, MB as appropriate
  • Test
    • Updated Selenium tests (automated)
  • Stage 2 prep
    • Use case updated and reviewed internally
    • Updated requirements and reviewed internally
    • Established initial draft of architecture and design
    • Created initial wireframes
After planning for Sprint 7, the follow is a list of current objectives:

  • Updating software development and system design documents as necessary
  • Key image identification
  • Resolve referential image non-displayable issue
  • VA Sandbox test
  • Expanding test database (report data and images)
  • Continue test development (test suites)
We will continue prepping for Stage 2 by performing the following:
  • Update requirements and seek baseline approval
  • Update wireframes
  • Draft initial design related to interfaces (LiFT, Direct)
Attached is the PPT provided during the session.

Download file "BBMI Sprint 6 Review Session and Stage 2 kickoff_2012July26.pdf"

0 comments

Sprint 5 Review, Sprint 6 Planning


In Kathleen's absence, I tried my hand as Scrum Master. During the Sprint, the team encountered some unforeseen challenges with fully integrating VIX and VistA Imaging. However, we addressed these blockers and any remaining issues should be resolved during the next Sprint. At this point we expect no schedule slippage to meet our end of August deadline for Stage 1 completion. As a team, we have made great strides throughout the project and it is impressive to see how far we've come.

I want to highlight the VistA Imaging integration (via VIX) capabillity. Last week during the Stakeholder presentation we simply demonstrated static images--but this time we were able to show both report data and referential images being pulled from VistA and ViX in a live demo! The presentation was well-received by the Stakeholders and our PM. The following is a list of our team's Sprint 5 accomplishments:

  • Documentation
    • Draft Software Development Plan (SDP) - peer reviewed and updated
    • Software Design Document (SDD) updates
  • Development
    • VistA Imaging patches applied
    • VistA Imaging integration (via VIX) to retrieve image metadata, thumbnail images, and referential images
    • Correlated MDWS report data to VIX report/study data
    • Initial Preview Page designed and developed
    • PDF file size estimate displayed; file size limit enforced
    • Referential images added to PDF report
    • Initial Section 508 compliance analysis performed
    • Stage 2 Use Case description expanded
  • Test
    • Updated Selenium tests
After planning for Sprint 6, the following is a list of current objectives:
  • Key image identification
  • Resolve referential image corruption issue
  • Expand Preview Page functionality - zoom image, pagination
  • Simplified login/logout
  • Error Page messages
  • Expanding test database (report data and images)
  • Continue test development (test suites)
  • Stage 2 Use Case updates and review
Attached is the PPT provided during the session.


Download file "BBMI Sprint 5 Review Session_2012July12.pdf"

0 comments

Sprint 4 Review, Sprint 5 Planning

As Scrum Master, I must reiterate how much of a pleasure it is to be working with such a great team of technical staff. They have all put in tremendous amounts of effort into getting us into the position we are today, and have openly addressed any blockers that may have surfaced during this time to ensure that our prototype is on schedule and that we'll meet our end of August deadline.

Just to note, in general we did encounter some VIstA Imaging environment setup issues and some time constraints that surfaced from this during this Sprint, but we anticipate that they will be resolved in Sprint 5 to enable us to work towards more of our objectives surrounding test data and images, as well as image accessibility and implementation into reports and preview displays.

This is no way should discredit the work that our team has accomplished during this Sprint as we have been able to demonstrate exceptional capabilities for the prototype; sometimes unanticipated blockers surface, and we were able to work through them as best as we could. The following is a list of our team's Sprint 3 accomplishments:

  • Documentation
    • Stage 1 System Design Document (SDD) approved
    • Review SDD for newly acquired specific design elements
    • Draft Software Development Plan (SDP)
  • Development
    • Manage test image availability with VIX and VistA Imaging
    • Design of accessing images (via thumbnail grid and preview, PDF report)
    • Design process of implementing MDWS data into Text and PDF Radiology Reports, and implement into respective report formats [Note: No new updates to report formats as the BB PHR Radiology Extract Elaboration Workgroup is sitll working towards their final formats.]
    • Finalize burning images with quality disclaimer (banner)
    • Internal preparation for Stage 2 (design and SME staffing)
After planning for Sprint 5, the follow is a list of current objectives:

  • Updating software development and system design documents as necessary
  • 'FIle Size' calculation and new column in results summary grid; check for max PDF file size
  • Implementing more extensive VistA/VistA Imaging test database (report data and images) and documenting process of accessing/inserting this data
  • Implementing process to retrieve JPEG referential images for PDF report
  • implementing process to retrieve JPEG thumbnail images for preview capability
  • Writing scripts to build/rebuild and populate VistA database with patient data for testing purposes
  • Internal preparation for Stage 2
Attached is the PPT provided during the session.

Download file "BBMI Sprint 4 Review Session_2012June28.pdf"

0 comments

Sprint 3 Review, Sprint 4 Planning

As Scrum Master, I am happy to say that over the mere 9 days of Sprint 3, our team has exceed expectations and has vastly improbed what we demonstrated at our last review. Our technical team members have achieved a long list of accomplishments in terms of both project documentation and development work, and have pushed us closer to completing Stage 1.

The following is a list of Sprint 3 accomplishments:

  • Documentation
    • All monthly updated deliverables (PMP, Project Schedule, etc.) and Stage 1 Master Test Plan (MTP) accepted
    • Updated Stage 1 System Design Document (SDD) and resubmitted for approval
  • Development
    • Worked on finalizing necessary functionality and process of making test images available through VistA Imaging (via vIX) and test data through VistA
    • Created MHeV homepage for the prototype
    • Default search page allows column sorting, pagination, as well as options to pull Text and PDF radiology reports
    • Completed PDF report with images
    • Investigation and implementation of image quality disclaimers on images
    • Finalized date range search page to align with MHeV (individual m/d/y selection and pop-up calendars)
    • Alignment with MHeV look/feel for all code written thus far

Some of the major discussion topics posed to the stakeholder audience were as follows:
  • Preferences for burning quality disclaimers into images
  • Image size in PDF (size/quality/etc. guidelines)
  • Confirmation of BB max file size and Veteran technical requirements
After planning for Sprint 4, the follow is a list of current objectives:

  • Design documentation updates
  • Design of accessing images (thumbnail preview, PDF)
  • Design for implementing MDWS data into Text and PDF radiology reports
  • Implementing larger VistA/VistA Imaging test database (report data and images) and documenting process of accessing/inserting data
  • Finalizing process of burning images/identifiers
  • Internal preparation for Stage 2
Attached is the PPT provided during the session.

Download file "BBMI Sprint 3 Review Session_2012June14.pdf"

0 comments